EFFICIENT WELDERS IN ABERDEEN

NORTH SEA ENERGY SERVICES LTD
Industrial Welder With Torch
Industrial zone, Steel pipelines in blue tones
Engineers Looking At Turbine

Projects

TOPSIDE CLAMPS & SUPPORTS
  • All Rolled In House

  • 3 Weeks Completion from PO

JTA SUBSEA SKID
  • Subsea skid and Pipework all completed in house

  • Pipe Yoke tested to 103T

  • Full dry build

  • Completion within 6 weeks

OVER TRAWL SKIDS
  • Offshore scan using FARO Scanner

  • Design and Drawings completed in-house

  • Manufacture of Skids

  • Trial Fit prior to Offshore delivery

ANTI VIBRATION CLAMPS
  • Rolling of Clamps completed in House

  • All Different sizes 

  • 100% NDT 

  • Full Mock-up off Offshore scenario prior to delivery

  • Delivered c/w Neoprene rubber Installed and all clamps bolted together

DECK HATCHES
  • All Hatches Fabricated to within 3mm

  • Full Installation items also supplied Including Sling sets

  • To ensure client deadline was met our facility was running 24/7 as per clients request.

PG08 REPLACEMENT LINE
  • Scanned With FARO

  • ISO's Produced with CAD 

  • All Butts Laser Surveyed with Leica Upon Completion

  • 100% RAD, PWHT & Pressure Test

  • Fitted By NSES Construction Team

FLOWHEAD PACKAGE
  • Full Flowhead Package

  • 6", 12, 16" & 20" Spools

  • Manufactured to DNV Spec

  • Completed with a 3mm Tolerance

  • Full  Laser Survey Package provided upon completion

OFFSHORE HPU FRAME
  • Complete Structure built in house 

  • Pre assembled prior to final sign off

  • Supply of all E & I components

  • Installation aided by NSES Construction Team

VARIOUS PROJECTS
FROM TOP LEFT TO RIGHT
  • 5" Diesel Line

  • Conductor Guides

  • Contingency Skid

  • Replacement Handrails

  • PTFE Centraliser Pads

  • Stainless Steel Louver