Projects
TOPSIDE CLAMPS & SUPPORTS
-
All Rolled In House
-
3 Weeks Completion from PO
JTA SUBSEA SKID
-
Subsea skid and Pipework all completed in house
-
Pipe Yoke tested to 103T
-
Full dry build
-
Completion within 6 weeks
OVER TRAWL SKIDS
-
Offshore scan using FARO Scanner
-
Design and Drawings completed in-house
-
Manufacture of Skids
-
Trial Fit prior to Offshore delivery
ANTI VIBRATION CLAMPS
-
Rolling of Clamps completed in House
-
All Different sizes
-
100% NDT
-
Full Mock-up off Offshore scenario prior to delivery
-
Delivered c/w Neoprene rubber Installed and all clamps bolted together
DECK HATCHES
-
All Hatches Fabricated to within 3mm
-
Full Installation items also supplied Including Sling sets
-
To ensure client deadline was met our facility was running 24/7 as per clients request.
PG08 REPLACEMENT LINE
-
Scanned With FARO
-
ISO's Produced with CAD
-
All Butts Laser Surveyed with Leica Upon Completion
-
100% RAD, PWHT & Pressure Test
-
Fitted By NSES Construction Team
FLOWHEAD PACKAGE
-
Full Flowhead Package
-
6", 12, 16" & 20" Spools
-
Manufactured to DNV Spec
-
Completed with a 3mm Tolerance
-
Full Laser Survey Package provided upon completion
OFFSHORE HPU FRAME
-
Complete Structure built in house
-
Pre assembled prior to final sign off
-
Supply of all E & I components
-
Installation aided by NSES Construction Team
VARIOUS PROJECTS
FROM TOP LEFT TO RIGHT
-
5" Diesel Line
-
Conductor Guides
-
Contingency Skid
-
Replacement Handrails
-
PTFE Centraliser Pads
-
Stainless Steel Louver