DELIVERING FABRICATION PROJECTS, END-TO-END
NORTH SEA ENERGY SERVICES LTD
At NSES Ltd, we provide fabrication, pipework, and structural engineering services, supported by trusted partners for Non-Destructive Testing (NDT) and advanced coatings. We support clients across Aberdeen and beyond with quality-led, dependable project delivery.
Get in touch with us today.



Projects
TOPSIDE CLAMPS & SUPPORTS
-
All Rolled in House.
-
3 Weeks Completion from PO.
JTA SUBSEA SKID
-
Subsea skid and Pipework all completed in house.
-
Pipe Yoke tested to 103T.
-
Full dry build.
-
Completion within 6 weeks.
OVER TRAWL SKIDS
-
Offshore scan using FARO Scanner.
-
Design and Drawings completed in-house.
-
Manufacture of Skids.
-
Trial Fit prior to Offshore delivery.
ANTI VIBRATION CLAMPS
-
Rolling of Clamps completed in House
-
100% NDT.
-
Full Mock-up off Offshore scenario prior to delivery.
-
Delivered c/w Neoprene rubber Installed and all clamps bolted together.
DECK HATCHES
-
All Hatches Fabricated to within 3mm
-
100% NDT.
-
Full Installation items also supplied Including Sling sets.
-
To ensure client deadline was met our facility was running 24/7 as per clients request.
RG08 REPLACEMENT LINE
-
Scanned With FARO.
-
ISO's Produced with CAD.
-
All Butts Laser Surveyed with Leica Upon Completion.
-
100% RAD, PWHT & Pressure Test.
-
Fitted By NSES Construction Team
FLOWHEAD PACKAGE
-
Full Flowhead Package.
-
6", 12, 16" & 20" Spools.
-
Manufactured to DNV Spec.
-
Completed with a 3mm Tolerance.
-
Full Laser Survey Package provided upon completion.
OFFSHORE HPU FRAME
-
Complete Structure built in house.
-
Pre assembled prior to final sign off.
-
Supply of all E & I components.
-
100% RAD, PWHT & Pressure Test.
-
Installation aided by NSES Construction Team.
VARIOUS PROJECTS
FROM TOP LEFT TO RIGHT
-
5" Diesel Line.
-
Conductor Guides.
-
Contingency Skid.
-
Replacement Handrails.
-
PTFE Centraliser Pads.
-
Stainless Steel Louver.





























